Project: Energy analysis for the International Airport of Moscow
Client: ACM-e srl, Florence (Italy)
Role: Head of the thermotechnical and services department
Year: 2011
Description: Energy analysis, modelling of energy fluxes. Within the project, preliminary dimensioning on a Tri-generation system approprietely integrated with existing thermal systems (gas thermal power plant and chiller), definition of process plans, dimensioning of the control and regulation logics. Main characteristics of the system: Four 3,3MWe engines, two 3,5MWt absorbers, three 900m3/h cooling towers, one line of overheated water, one line of low temperature water.