Indoor Radon measurement, Remedy interventions in a private home in Lamezia Terme (Cz)

Misure di radon indoor
Project: Indoor Radon measurement, Remedy interventions in a private home in Lamezia Terme (Cz)

Client: Private

Role: planning, consultancy.

Year: 2013

Description: In close collaboration with Arpacal (Ettore Majorana Physics Laboratory Department of Catanzaro (CZ), during the reconstruction of a private building in the municipality of Lamezia Terme (CZ) we proceeded with remedy interventions aimed at the reduction of the radon risk because the values of its concentration were defined unacceptable by the risk evaluation report. (Participation at the 36th National Meeting of Radioprotection AIRP in Palermo 18th to 20th September 2013).

Energy analysis of the wire drawing and zinc-coating workshops in the Gruppo Pittini plant, Italy

zincheria

Project: Energy analysis of the wire drawing and zinc-coating workshops in the Gruppo Pittini plant, Italy

Client: ACM-e srl, Florence (Italy)

Role: senior energy planner thermal department

Year: 2012

Description: Energy flux analysis, preliminary dimensioning and economic evaluation of thermal recovery systems (shell and tube exchangers); preliminary dimensioning and economic evaluation of a cogeneration system (internal combustion engine).

Commercial building in Genova, 22 floors, 10.000m2, Energy evaluation on thermo-technical systems

genova1

Project: Commercial building in Genova, 22 floors, 10.000m2, Energy evaluation on thermo-technical systems

Client: ACM-e srl, Florence (Italy)

Role: senior energy planner, thermal department

Year: 2013

Description: Energy fluxes analysis, energy efficiency interventions technical and economic feasibility studies: thermal station technological update, ventilation system regulation and control optimization.

Technical and administrative consultancy for the issue of White Certificates

consutec
Project: Technical and administrative consultancy for the issue of White Certificates

Client: Esco Veneto

Role: Technical chies for the procedure

Year: 2013

Description:Project for the measurement and technical administrative procedure at the GSE to obtain the Title of Energy Efficiency (White Certificates) for efficiency interbentions on the production line of the SELENE S.p.A. in Lucca (Leading company for the production of plastic films)

Thermo-technical systems (5MW installated) Technical evaluation in a thermal centre in Veneto (Italy)

impianti_termo

Project: Thermo-technical systems (5MW installated) Technical evaluation in a thermal centre in Veneto (Italy)

Client: Acm-e srl, Florence

Role: Project Head Engineer

Year: 2014

Description: The technical evaluation was requested after various running failures of the plant. The project consisted in varifying the correct design of the plant, in comparing it with the project specifications, in identifuing the causes and the solutions of the failures.