Energy Service Management for 15 Tuscany ASL buildings, in collaboration with Energy COOP Srl of the Gruppo Cellini Gtc (Po)

Gestione servizi energetici ASL Toscana

Project: Energy Service Management for 15 Tuscany ASL buildings, in collaboration with Energy COOP Srl of the Gruppo Cellini Gtc (Po)

Client: CET (Società Consortile Energia Toscana scrl)

Role: energy modelling, technical-economic identification and evaluation of improvement solutions in architectural, mechanic and electric systems, preliminary design

Year: present

Description: energy audit, executive planning, realisation of improving energy efficiency interventions with management and maintenance, in 15 public buildings belonging to different Aziende Sanitarie Locali – Local Health Units (ASL) in Tuscany, Italy.

Energy analysis for the International Airport of Moscow

Aeroporto_1

Project: Energy analysis for the International Airport of Moscow

Client: ACM-e srl, Florence (Italy)

Role: Head of the thermotechnical and services department

Year: 2011

Description: Energy analysis, modelling of energy fluxes. Within the project, preliminary dimensioning on a Tri-generation system approprietely integrated with existing thermal systems (gas thermal power plant and chiller), definition of process plans, dimensioning of the control and regulation logics. Main characteristics of the system: Four 3,3MWe engines, two 3,5MWt absorbers, three 900m3/h cooling towers, one line of overheated water, one line of low temperature water.

Building energy renewal for single family use in Abruzzo (Italy), according to bio-architectural, bio-climatic and energy efficiency principles

Riqualificazione energetica di un edificio monofamiliare in Abruzzo

Project: Building energy renewal for single family use in Abruzzo (Italy), according to bio-architectural, bio-climatic and energy efficiency principles

Client: Private

Role: Energy Designer

Year: 2013

Description: Activity objectives

Reduced use of energy resources through a correct design of the structures, the use of natural ventilation for cooling and heating (bioclimatics)
Ecological quality, use of natural materials originating from the same territory (stone, wood, raw earth, natural lime, natural paints-earth pigments)
Indoor comfort and quality, correct temperature distribution design, the use of biological materials and paints indoors, wide use of natural lighting integrated with appropriate shading systems
Use of renewable energy, solar, thermal, photovoltaic,  rain water harvesting

Integrated Plan (Teramo, Italy) Project according to eco-social architecture and engineering principles

Progetto di Piano Integrato_1

Project: Integrated Plan (Teramo, Italy) Project according to eco-social architecture and engineering principles

Client: Private

Role: Designer

Year: 2006-2007

Description: new area design in Teramo (Italy) aimed at high energy saving levels and environmentally sustainability in residencial and social building (social building, commercial spaces, social centres, green areas, parking spaces and plant installations).

Renewal project according to the principles of Bioarchitecture

Ristrutturazione secondo i principi della Bioarchitettura

Project: Renewal project according to the principles of Bioarchitecture

Client: Private

Role: Energy Designer

Year: 2004-2005

Description: Reinforcement, energy renewal and reorganisatin of an ancient home in Pietracamela (TE), enlisted among the “Borghi più belli d’Italia” (most beautiful hamlets in Italy) inside the Parco del Gran Sasso e Monti (Gran Sasso and Monti National Park)

Geological and Plant Vocational analysis of the territory Municipality the 15th, Rome (Italy)

analisi_geolociga

Project: Geological and Plant Vocational analysis of the territory Municipality the 15th, Rome (Italy)

Role: Engineer G. Racioppi, project technical chief as employee of the ACM-e srl

Year: 2008

Description: Geological analysis of the territory of the 15th Municipality of Rome (Italy) and technical-economic evaluation of low enthalpy geothermal installation with vertical and horizontal probes

Preliminary plan photovolteic system 500kWp

impianto_fotovoltaico

Project: Preliminary plan photovoltaic system

Role: Engineer G. Racioppi, designer, as employee of the ACM-e srl (Italy)

Year: 2009

Description: Preliminary electrical design for the request of national electric network connection to ENEL, 500kWp photovoltaic plant in Basilicata (norms CEI 0-16 and CEI 82-25).

Energy analysis at the seat of the Cerved Group (building, 6.200 m2)

cervedgroup1

Project:Energy analysis at the seat of the Cerved Group (building, 6.200 m2)

Client: ACM-e srl, Florence (Italy)

Role: senior energy planner

Year: 2011

Description: Energy fluxes analysis, EN15232 certification of the plant, MT electric source and distribution measurement and analysis campaign, evaluation and analysis of heating, ventilation and cooling systems.

Energy analysis of tyre reinforcement wires Pirelli production plant

impianti4

Project: Energy analysis of tyre reinforcement wires Pirelli production plant (Italy)

Client: ACM-e srl, Florence (Italy)

Role: senior energy planner, thermal department

Year: 2012

Description: Energy flux analysis, preliminary design and economic evaluation for: productive departments cooling system technological update; 1,2MWe cogeneration system (gas turbine).